Backyard before ADU construction in Hidden Hills
Completed backyard project in Hidden Hills
Before
After
adu builder hidden hills

ADU builder
Hidden Hills.

Hidden Hills requires HOA and architectural review on every ADU before city permits — privacy planning, estate access, and large utility runs are part of the job. We handle garage conversions, detached units, and ARC packets in parallel with plan check.

$115k–$185kgarage conversion
16–24 weekstypical build
6–12 weekspermit review
Bonded & Insured$2M Liability
Transparent PricingLine-item quotes
Licensed TechsPool, equipment, and startup care
5 / 5 Stars187 Google reviews
Local Conditions

ADU work in
Hidden Hills.

ADUs in Hidden Hills require HOA coordination, privacy planning, and estate-scale logistics. Foundations, garage slab reinforcement, and utility trenching have to account for large equestrian lots with hillside edges and private-road access. Plan check runs through City of Hidden Hills Building and Safety with Title 24 energy compliance and structural review on every permitted unit. Garage conversions often move faster than detached new-builds because the shell exists; hillside lots, tight side yards, and long utility runs can still add foundation and MEP cost. Most ADU construction in Hidden Hills lands in the $125,000-$360,000 range — garage conversions from $115k–$185k, detached units from $250k–$390k. Permit fees, utility connections, soils reports, and design are quoted separately by line item. Finish level, fire sprinklers, and separate utility meters are the usual cost drivers after site conditions. The entire city has HOA and architectural review before construction can move forward. We coordinate HOA/ARC packets — exterior materials, parking replacement, access plans — in parallel with city submittals when they apply. We already build in your backyard. Here's what we handle for Hidden Hills homeowners.

01

Permits and inspections

City of Hidden Hills Building and Safety handles ADU plan check, structural review, and certificate of occupancy. Typical plan check: 6–12 weeks.

02

HOA and access

The entire city has HOA and architectural review before construction can move forward. That drives how we stage garage conversions, utility trenching, and detached ADU placement.

03

Soil and foundation

large equestrian lots with hillside edges and private-road access affects foundation depth, garage slab reinforcement, and utility routing for detached units.

04

Pricing in Hidden Hills

Most ADU projects here land $125,000-$360,000 — garage conversions from $115k–$185k, detached units from $250k–$390k.

Pool + ADU

Also a pool builder in
Hidden Hills.

We build pools and ADUs on the same lots across Southern California. When both are planned together, shared excavation, grading, and utility trenching often saves 10–15% versus separate projects.

Pool builder in Hidden Hills ADU construction overview

Nearby Cities

Also serving
nearby areas.

View nearby cities
Hidden Hills ADU service area
Common Questions

Hidden Hills
ADU FAQ.

How much does an ADU cost in Hidden Hills?
Most ADU construction in Hidden Hills runs $125,000-$360,000 depending on type and finish level. Garage conversions typically start $115k–$185k; detached new-build units $250k–$390k. Permit fees, utility connections, and soils work are quoted separately.
Who handles ADU permits in Hidden Hills?
ADU permits in Hidden Hills run through City of Hidden Hills Building and Safety. Plan check typically takes 6–12 weeks. We prepare structural plans, Title 24 energy calcs, and submittals; you sign what the city requires.
Can I build an ADU and a pool on the same lot in Hidden Hills?
Usually yes. Pools and ADUs have separate setback and lot-coverage rules. When both are planned together, shared excavation, grading, and utility trenching often saves 10–15% versus separate projects.
Do Hidden Hills ADU projects need HOA approval?
The entire city has HOA and architectural review before construction can move forward When HOA or ARC review applies, we submit exterior finish boards, site plans, parking replacement details, and staging plans in parallel with the city permit package — not after plan check.
Do I need to replace parking after a garage conversion in Hidden Hills?
Converting a garage removes covered parking. California law (Government Code 65852.2) often exempts garage-conversion ADUs from replacement parking when the property is within half a mile of transit, in a historic district, or where on-street permits are available — many Hidden Hills addresses qualify. When replacement is required, we price a driveway pad or carport ($5,000–$15,000) during the feasibility walk. HOA/ARC rules in Hidden Hills can add exterior and screening requirements on top of city parking rules.
Free ADU consult

Let's scope your ADU in Hidden Hills.

Share the address, ADU type, and rough budget. We reply within one business day with a time for a free phone consult — feasibility, setbacks, and a real project range, not a teaser price.

By submitting, you agree to our privacy policy. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
  • Free phone consult — lot feasibility in 1 business day
  • Floor plan direction & project range in 5 days
  • No deposit until contract signed
  • Honest "no" if the lot doesn't pencil
Call us directly
(747) 293-9482
Call Get a quote