Detached ADU construction
Los Angeles.
A detached ADU is a standalone structure in your backyard — its own foundation, walls, roof, kitchen, bathroom, and entrance. Up to 1,200 sq ft under California law. Maximum design flexibility because you are building from the ground up on your own terms. We handle everything from feasibility through certificate of occupancy.
Detached ADU
scope.
A detached ADU is a ground-up build — same construction phases as a small house. Foundation, framing, roofing, plumbing, electrical, HVAC, fire sprinklers, insulation, drywall, finishes, landscaping, and exterior hardscape. Nothing is inherited from an existing structure, so everything is built to current code from the start.
Scope before site work
Design, feasibility, and the permit path get sorted before a shovel touches the yard.
- Lot survey and setback verification
- Excavation and grading
- Concrete foundation (slab-on-grade or raised foundation)
Field execution
Foundation, framing, MEP, finishes, and inspections are sequenced so the city does not bounce us.
- Wood or steel framing, roof trusses, and sheathing
- Rough plumbing, electrical, HVAC, and fire sprinkler installation
- Insulation and Title 24 energy compliance
Finish and handoff
Final inspections, utility connections, and owner walkthrough are part of closeout.
- Drywall, paint, trim, flooring, cabinets, countertops, and fixtures
- Exterior stucco, siding, and landscaping restoration
- Final building inspection and certificate of occupancy
What your detached ADU can include.
California law allows detached ADUs up to 1,200 sq ft. Local cities cannot impose a size limit below the state minimum.
Studio
Open plan living/sleeping area, full kitchen, bathroom. Ideal for single renters, home offices with rental potential, or aging parents who want independence without isolation.
One-bedroom
Separate bedroom, living area, full kitchen, bathroom. The most popular rental configuration. Rents competitively with one-bedroom apartments in LA at $2,000 to $3,500/month depending on neighborhood.
Two-bedroom
Two bedrooms, living area, full kitchen, bathroom. Works for small families, premium rental units, or live-in caregivers. Commands $2,800 to $4,500/month in rent in most LA neighborhoods.
California setback and height rules for detached ADUs.
State law sets the baseline. Your city can be more permissive but cannot be more restrictive. Rear and side setbacks: 4 feet minimum from property lines for detached ADUs — cities cannot require more than 4 feet. Height: up to 16 feet for a single-story detached ADU, up to 18 feet if within half a mile of a major transit stop, and up to 25 feet for a two-story ADU on a multifamily lot or when attached to the primary dwelling (AB 1332). Lot coverage: state law prohibits cities from applying lot coverage or FAR limits that would prevent construction of an 800 sq ft ADU. Parking: no additional parking is required for ADUs in most circumstances — including when the property is near public transit, in a historic district, part of an existing structure, or when on-street parking permits are available. We verify all setback, height, and lot coverage requirements during the feasibility walk. Some properties have easements, utility corridors, or tree preservation zones that affect where the ADU can sit.
Detached ADU
projects.
How this
work moves.
Detached ADU construction typically runs 18–26 weeks from contract to certificate of occupancy. Plan check for new-builds takes longer than conversions — budget 8 to 14 weeks for LADBS, shorter for some smaller cities.
Site assessment and design
Property walk, setback measurement, utility location, soils assessment when needed. Floor plan, 3D model, material selections, and design approval before engineering starts.
Engineering and permits
Structural engineering, Title 24 energy calcs, soils report when required, city plan check submittal. Detached new-builds take longer in plan check than conversions — budget 8 to 14 weeks for LADBS, shorter for some smaller cities.
Construction
Site prep, foundation, framing, roofing, rough MEP, insulation, drywall, finish work, exterior, landscaping. Inspections happen at each phase — foundation, framing, rough MEP, insulation, drywall, and final.
Final and handoff
Building department final inspection, utility meter activation, appliance install, landscaping completion, owner walkthrough. Certificate of occupancy issued.
What does detached adu
cost in Los Angeles?
Detached new-build ADUs in Los Angeles typically cost $200,000 to $400,000 depending on size, site conditions, and finish level. Per-square-foot costs range from $280 to $450. A one-bedroom unit in the 700 sq ft range on a flat lot usually lands around $220,000 to $280,000. Two-bedroom units at 1,000 to 1,200 sq ft run $300,000 to $400,000. Typical timeline: 18-26 weeks.
18-26 weeks
Permits, soils, inspections, and finish picks still move the calendar.
California ADU laws that affect detached builds.
Setbacks, height limits, and impact-fee exemptions come from state law — your city cannot go more restrictive. Here is what matters in 2026:
4-foot setbacks
Under 750 sq ft
AB 976
Pool and ADU on the same lot?
Detached ADUs and custom pools have separate setback rules and can usually coexist. When you build both together, shared excavation, grading, and utility trenching typically saves 10–15% versus separate projects.
ADU vs pool value guide ADU cost breakdown See pool construction
ADU construction across
Southern California.
Detached ADU in Los Angeles, Ventura, and Orange counties.
View all cities we serve
Detached ADU
FAQ.
How close to the property line can I build a detached ADU?
Can I build a two-story detached ADU?
Does a detached ADU need a separate address?
Can I build a detached ADU if I already have a pool?
What is the ROI on a detached ADU in Los Angeles?
Let's price your detached adu.
Share the address, ADU type, and rough budget. We reply within one business day with a time for a free phone consult — feasibility, setbacks, and a real project range, not a teaser price.
- Free phone consult — lot feasibility in 1 business day
- Floor plan direction & project range in 5 days
- No deposit until contract signed
- Honest "no" if the lot doesn't pencil