ADU builder
Irvine.
Irvine ADUs start with village HOA approval before City of Irvine Community Development — compact tracts, design standards, and tight staging matter as much as setbacks. We handle garage conversions, detached units, and certificate of occupancy.
ADU work in
Irvine.
ADU projects in Irvine are usually less about hillside engineering and more about HOA standards and tight staging. Foundations, garage slab reinforcement, and utility trenching have to account for planned-community pads, HOA design rules, and compact access in newer tracts. Plan check runs through City of Irvine Community Development with Title 24 energy compliance and structural review on every permitted unit. Garage conversions often move faster than detached new-builds because the shell exists; hillside lots, tight side yards, and long utility runs can still add foundation and MEP cost. Most ADU construction in Irvine lands in the $115,000-$330,000 range — garage conversions from $105k–$170k, detached units from $220k–$340k. Permit fees, utility connections, soils reports, and design are quoted separately by line item. Finish level, fire sprinklers, and separate utility meters are the usual cost drivers after site conditions. Many Irvine villages require HOA approval before city permits. We coordinate HOA/ARC packets — exterior materials, parking replacement, access plans — in parallel with city submittals when they apply. We already build in your backyard. Here's what we handle for Irvine homeowners.
Permits and inspections
City of Irvine Community Development handles ADU plan check, structural review, and certificate of occupancy. Typical plan check: 6–12 weeks.
HOA and access
Many Irvine villages require HOA approval before city permits. That drives how we stage garage conversions, utility trenching, and detached ADU placement.
Soil and foundation
planned-community pads, HOA design rules, and compact access in newer tracts affects foundation depth, garage slab reinforcement, and utility routing for detached units.
Pricing in Irvine
Most ADU projects here land $115,000-$330,000 — garage conversions from $105k–$170k, detached units from $220k–$340k.
Projects near
Irvine.
Garage, detached,
full build.
Everything below is available in Irvine; permits, soils, and access get sorted before site work opens.
Also a pool builder in
Irvine.
We build pools and ADUs on the same lots across Southern California. When both are planned together, shared excavation, grading, and utility trenching often saves 10–15% versus separate projects.
Also serving
nearby areas.
View nearby cities
Irvine
ADU FAQ.
How much does an ADU cost in Irvine?
Who handles ADU permits in Irvine?
Can I build an ADU and a pool on the same lot in Irvine?
Do Irvine ADU projects need HOA approval?
Do I need to replace parking after a garage conversion in Irvine?
Let's scope your ADU in Irvine.
Share the address, ADU type, and rough budget. We reply within one business day with a time for a free phone consult — feasibility, setbacks, and a real project range, not a teaser price.
- Free phone consult — lot feasibility in 1 business day
- Floor plan direction & project range in 5 days
- No deposit until contract signed
- Honest "no" if the lot doesn't pencil