ADU builder
Pasadena.
Pasadena ADUs go through City of Pasadena Permit Center — separate from LADBS — with historic districts, mature trees, and tight access on older lots. We handle garage conversions, detached units, Title 24, and certificate of occupancy.
ADU work in
Pasadena.
ADU builds in Pasadena are shaped by older homes, mature trees, and a city permit process separate from LADBS. Foundations, garage slab reinforcement, and utility trenching have to account for older alluvial soils, landmark homes, and tight access in historic districts. Plan check runs through City of Pasadena Permit Center with Title 24 energy compliance and structural review on every permitted unit. Garage conversions often move faster than detached new-builds because the shell exists; hillside lots, tight side yards, and long utility runs can still add foundation and MEP cost. Most ADU construction in Pasadena lands in the $115,000-$330,000 range — garage conversions from $105k–$170k, detached units from $220k–$340k. Permit fees, utility connections, soils reports, and design are quoted separately by line item. Finish level, fire sprinklers, and separate utility meters are the usual cost drivers after site conditions. Bungalow Heaven and Linda Vista projects may have design review or preservation limits. We coordinate HOA/ARC packets — exterior materials, parking replacement, access plans — in parallel with city submittals when they apply. We already build in your backyard. Here's what we handle for Pasadena homeowners.
Permits and inspections
City of Pasadena Permit Center handles ADU plan check, structural review, and certificate of occupancy. Typical plan check: 6–12 weeks.
HOA and access
Bungalow Heaven and Linda Vista projects may have design review or preservation limits. That drives how we stage garage conversions, utility trenching, and detached ADU placement.
Soil and foundation
older alluvial soils, landmark homes, and tight access in historic districts affects foundation depth, garage slab reinforcement, and utility routing for detached units.
Pricing in Pasadena
Most ADU projects here land $115,000-$330,000 — garage conversions from $105k–$170k, detached units from $220k–$340k.
Projects near
Pasadena.
Garage, detached,
full build.
Everything below is available in Pasadena; permits, soils, and access get sorted before site work opens.
Also a pool builder in
Pasadena.
We build pools and ADUs on the same lots across Southern California. When both are planned together, shared excavation, grading, and utility trenching often saves 10–15% versus separate projects.
Also serving
nearby areas.
View nearby cities
Pasadena
ADU FAQ.
How much does an ADU cost in Pasadena?
Who handles ADU permits in Pasadena?
Can I build an ADU and a pool on the same lot in Pasadena?
Do Pasadena ADU projects need HOA approval?
Let's scope your ADU in Pasadena.
Share the address, ADU type, and rough budget. We reply within one business day with a time for a free phone consult — feasibility, setbacks, and a real project range, not a teaser price.
- Free phone consult — lot feasibility in 1 business day
- Floor plan direction & project range in 5 days
- No deposit until contract signed
- Honest "no" if the lot doesn't pencil